City of Buffalo 18″ South Water Transmission Line Replacement Project:
This project is planned to start construction in the fall of 2014, and consists of the replacement of the 18-inch asbestos transmission line feeding south Buffalo. Also included in the project are two highway crossings and multiple utility crossings. The project will supply water to south Buffalo and provide an emergency bypass to allow for repairs or upgrades to the transmission line in the future.