Nelson Engineering is in the final stages of construction management of the Gateway Pump Station Project in Rock Springs, Wyoming. Design and construction of the project involved the replacement of 3,000 linear feet of water main and a dated potable water pump station. The design related to the new pump station was quite complicated, in that there are multiple system conditions, which results in several operating curves. Also included in the design was a detailed operating scheme that required working closely with the SCADA/Control Contractor to tie the new pump station into the City’s existing SCADA system. The project is scheduled to be completed this fall.